GDEB Bldg 605 – SLR Storm Drainage Analysis Rpt 02-23-2021 — March 4, 2021

Icon of GDEB Bldg 605 - SLR Storm Drainage Analysis Rpt 02-23-2021 GDEB Bldg 605 - SLR Storm Drainage Analysis Rpt 02-23-2021, GDEB-Bldg-605-SLR-Storm-Drainage-Analysis-Rpt-02-23-2021.pdf (4.6 MiB)

GDEB Bldg 605 – P&Z Permit Plans 2-23-2021 — 

Icon of GDEB Bldg 605 - P&Z Permit Plans 2-23-2021 GDEB Bldg 605 - P&Z Permit Plans 2-23-2021, GDEB-Bldg-605-PZ-Permit-Plans-2-23-2021.pdf (23.6 MiB)

GDEB Bldg 605 – P&Z Application 02-21-2021 — 

Icon of GDEB Bldg 605 - P&Z Application 02-21-2021 GDEB Bldg 605 - P&Z Application 02-21-2021, GDEB-Bldg-605-PZ-Application-02-21-2021.pdf (4.7 MiB)

GDEB Bldg 605 – MMI-SLR Geotech Rpt 12-07-2020 — 

Icon of GDEB Bldg 605 - MMI-SLR Geotech Rpt 12-07-2020 GDEB Bldg 605 - MMI-SLR Geotech Rpt 12-07-2020, GDEB-Bldg-605-MMI-SLR-Geotech-Rpt-12-07-2020.pdf (5.3 MiB)

GDEB Bldg 605 – F&O Stormwater Report 05-22-2019 — 

Icon of GDEB Bldg 605 - F&O Stormwater Report 05-22-2019 GDEB Bldg 605 - F&O Stormwater Report 05-22-2019, GDEB-Bldg-605-FO-Stormwater-Report-05-22-2019.pdf (19.4 MiB)
Groton
April 5, 2021 the Municipal Building will reopen Monday through Thursday 8am - 4pm.