Subdivision: Cover and Table of Contents

For a graphical illustration of the conceptual subdivision approval process refer to the following: DIAGRAM: CONCEPTUAL SUBDIVISION PROCESS

ARTICLE 1.00   INTRODUCTION
1.01                   AUTHORITY
1.02                   PURPOSES
1.03                   APPLICABILITY
1.04                   MODIFICATION OF STANDARDS
1.05                   ADMINISTRATIVE PROVISIONS

ARTICLE 2.00   INTERPRETATION
2.01                   INTERPRETATION OF REGULATIONS
2.02                   USE OF TERMS
2.03                   DEFINED TERMS

ARTICLE 3.00   PARCEL AND LOT REQUIREMENTS
3.01                   LAND SUITABILITY
3.02                   PROTECTION OF IMPORTANT FEATURES
3.03                   FLOOD PROTECTION
3.04                   LOT LAYOUT
3.05                   OPEN SPACE
3.06                   SOLAR ACCESS
3.07                   SOIL EROSION AND SEDIMENT CONTROL

ARTICLE 4.00   INFRASTRUCTURE REQUIREMENTS
4.01                   STREETS
4.02                   SIDEWALKS
4.03                   DRIVEWAYS
4.04                   SEWAGE
4.05                   WATER
4.06                   FIRE PROTECTION
4.07                   STORM DRAINAGE
4.08                   WIRE UTILITIES
4.09                   STREET LIGHTS
4.10                   STREET TREES

ARTICLE 5.00   APPLICATION PROCEDURES
5.01                   GENERAL
5.02                   PRELIMINARY STAFF REVIEW (OPTIONAL)
5.03                   PRELIMINARY COMMISSION REVIEW (OPTIONAL)
5.04                   FORMAL SUBDIVISION APPLICATION
5.05                   RECEIPT AND SCHEDULING
5.06                   NOTICE PROVISIONS
5.07                   PUBLIC HEARINGS
5.08                   APPLICATION PROCESSING AND ACTION

ARTICLE 6.00   POST- APPROVAL PROCEDURES
6.01                   FINALIZING APPROVED PLANS
6.02                   PROVISION OF FINANCIAL GUARANTEE
6.03                   SUBMISSION FOR SIGNATURE
6.04                   FILING OF APPROVED PLANS
6.05                   MODIFICATION OF APPROVAL

ARTICLE 7.00   CONSTRUCTION PROCEDURES
7.01                   CONSTRUCTION – EROSION AND SEDIMENT CONTROL
7.02                   CONSTRUCTION – CLEARING AND GRADING
7.03                   CONSTRUCTION OF IMPROVEMENTS
7.04                   INSPECTION OF IMPROVEMENTS
7.05                   PERIOD FOR COMPLETION OF IMPROVEMENTS
7.06                   MONUMENTS AND MARKERS
7.07                   FINAL ACCEPTANCE AND MAINTENANCE

Groton
April 5, 2021 the Municipal Building will reopen Monday through Thursday 8am - 4pm.