Chronology of Text Amendments

 

 
Section Affected
 
Date Number Title Description of Amendment
5/15/1975
All Adoption of Zoning Ordinance
12/1/2016
All Comprehensive reorganization and amendments
12/21/2017
2.2 Definitions Added definition for Historic/Institutional Adaptive Reuse
6.13 NEW Historic/Institutional Adaptive Reuse New Section
2/12/2018
4.3.C Principal Uses Permitted by Site Plan New use Cultural/Historic Memorial Parklet
4/3/2019
All Reformatting of page numbers, section titles and headers
2.1.B.1 Common Terms Added ‘site’
2.2 Definitions Deleted incorrect subsection cross reference
2.2 Definitions Added definition of ‘structural fill’ to complement amendments to 7.3
4.1.C; 4.2.C; 4.3.C; 4.4.B; 4.5.B Business and Industrial Zones Added ‘and City Planner’; see Section 9.3 for complementing amendments
4.1.J Design Considerations Corrected cross reference to Section 8.4
4.2.H Design Considerations Corrected cross reference to Section 8.4
5.2.C Applicability Added cross reference to Appendix B
5.3 FP – Flood Protection Overlay Zone Various amendments to respond to State of Connecticut building code revisions
7.1.8 (Parking) Other Uses Added item ‘g. Mixed Use’
7.3 Earthwork and the Importing and Exporting of Earth Products Various amendments to clarify importing and exporting rather than using the terms ‘fill’ and ‘cut’; Amendments clarify applicability of brining or removing earth products to a site
7.8.C.10 Erosion and Sedimentation added “planned, engineered and…” to distinguish that ES measures should not only be installed per the CT manual but also designed in accordance with the Manual
9.3.B.2.b Applicability Change of use only requires zoning permit based upon listed thresholds
9.3.B.2.d.iv Applicability Defined ‘site’ for its use in this section only
9.3.B.3 NEW Applicability City Planner may review and approve site plans in non-residential districts; CAM shall be reviewed by Commission by CGS
9.3.B.4 Applicability Defined minor v. major modifications
9.3.C Submission Requirements Cross referenced Appendix A; clarified timing of submission and requirements
9.4.B Submission Requirements Clarified timing of submission and requirements
9.5.B Submission Requirements Clarified timing of submission and requirements
9.6.B Submission Requirements Clarified timing of submission and requirements
9.7.C.1 Variances Cross referenced Appendix C
9.9.H Posting of Sign Added specific sign dimensions and formatting requirements
Appendix A Redraft of submission requirements
Appendix B Clarified timing of submission
9/2/2020
5.4.A.2 Application Procedure for MUDD Submitted to the Planning and Zoning Commission
5.4.A.3 Public Hearing, Personal Notice, and Action
5.4.A.4 Criteria for Decisions on Change of Zone and Master Plan General Findings and Site Plan Approval
5.4.A.5 Specific Requirements for All MUDDs
5.4.A.6 Specific Requirements for Residential Development in a MUDD
5.4.A.7 Specific Requirements for Commercial and Mixed Use Development in a MUDD
5.4.A.8 Conformance to Recorded Documents
5.4.A.9 Amendment or Extension of Approved MUDDs
5.4.A.10 Commencement and Completion of Construction
5.4.A.11 Performance Bonds
5.4.A.12 Deeds
5.4.A.13 Outside Storage Applicable to Uses in a Mixed Use Development District

Groton
April 5, 2021 the Municipal Building will reopen Monday through Thursday 8am - 4pm.