Phase II Stormwater Permitting Plan

The City of Groton is required to submit a Stormwater Management Plan for our entire drainage system to the Connecticut Department of Environmental Protection (CTDEP) as part of the Environmental Protection Agency’s (EPA) Phase II stormwater requirements. The program requires municipalities with a population of at least 1,000 people within an urbanized area to come up with goals that the City intends on meeting for six minimum control measures. These measures are as follows:

  • Public Education and Outreach
  • Public Involvement and Participation
  • Illicit Discharge and Detection
  • Construction Site Stormwater Runoff Control
  • Post Construction Stormwater Management
  • Pollution Prevention and Good Housekeeping

 

The City’s Engineering Department has formulated a draft copy of the plan. At this time, we are soliciting questions and comments from the public. If you would like to download a copy of the draft plan, please click on Draft MS4 Plan. Hard Copies of the plan are also available at the City Clerk’s front desk at the City of Groton Municipal Building; 295 Meridian Street, Groton, Ct 06340 and at the Librarian’s desk in the Bill Memorial Library, 240 Monument Street, Groton, Ct 06340. To forward along questions or comments please send them to the City’s Engineering Department at the above address or you can send them by e-mail to lewisw@cityofgroton-ct.gov.